High-Density Curbside Infrastructure

Volt Virginia is currently in the active scoping phase for the 2026 Richmond Urban Hub, a pilot program designed for high-density residential corridors.

The Urban BTM Advantage

Behind-The-Meter (BTM) Logic

We tap into the building’s existing spare electrical capacity. No new industrial transformers or massive utility construction required.

Low-Profile Aesthetics & Historic Preservation

Low-profile, "bring-your-own-cord" bollards eliminate sidewalk clutter and preserve the aesthetic integrity of your property.

Turnkey Management

Volt Virginia handles the Dominion Energy & Utility Partners interface, local permitting, and 24/7 hardware monitoring.

Designed for the Resident, Managed for the Owner.

Street parking shouldn't prevent EV adoption. Our urban model allows residents without driveways to charge overnight at the curb. We handle the 24/7 monitoring, maintenance, and utility coordination, leaving you with a premium amenity and a new source of passive revenue.

Charging an electric car

The Infrastructure Gift.

  • Total Investment: $45,000 – $65,000 in site upgrades.
  • Host Cost: $0.00.
  • Funding Stack: We maximize IRS 30C Tax Equity and Utility Make-Ready incentives to eliminate your CAPEX.
  • Revenue Share: Site hosts receive a monthly slice of gross charging revenue, turning the curb into a managed asset.
rows of houses in a residential area in Virginia and blooming apple trees along the sidewalk with parking lots.

📍 Phase 1: High-Density Residential Corridors

We are accepting a limited cohort of site hosts for our 2026 Urban Pilot. Priority is given to properties in Dominion Energy territories with 20+ street-parked residential units.

Deadline: Scoping for the current funding window closes March 31, 2026.

FAQs

Who pays for the electricity?

Volt Virginia manages the billing. Drivers pay via app; we reimburse the host and share the revenue.

Is this ADA compliant?

Yes. Our urban bollards are designed for the right-of-way with specific focus on path-of-travel and reach-range standards.

How do we get started?

Submit your site address below for a complimentary grid-capacity and feasibility study.

Pre-Qualify Your Property for the 2026 Urban Pilot

Our engineering team will review your site’s proximity to Dominion Energy infrastructure and current grid capacity. Phase 1 Scoping for the March 31 deadline is currently active.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

We use cookies to analyze site traffic and optimize our infrastructure development. By clicking 'Accept All', you consent to our use of cookies.